Featured posts
London11 Data Centre
Virtus London11 Data Centre We’ve just finished work at the VIRTUS London11 Data Centre in Slough, installing a series of access platforms and walkways...
Dinas Dam Upgrade
We are off to Wales in July to replace a rusted steel access ladder in a shaft that services the Dinas Dam near Aberystwyth....
Craigentinny Embankment Stairs
The staircase at Craigentinny needed to provide almost vertical access going from the road down to the track, landing by a small, brick-built bridge
Selhurst Revisited
We revisited the solution that gave maintenance teams in the inspection and cleaning sheds at Selhurst Traincare Depot, safe and easy access.
The Broadway, London
We were privileged to be contracted by Keltbray to install 350 riser floors at The Broadway, an exclusive new development at St James Park.
A New Way of Working
Working with Kier, our engineers are developing a new way of installing GRP Riser Floors that saves time and money.
Ely Place – Access Improvements
A one-day project, replacing a rotten wooden Hop Over and a rusty flight of Access Stairs with low-maintenance, long-lasting GRP equivalents
Scottish Water, Whitehillocks
We were asked by Scottish Water to provide safe access to a large chemical bund for operational and maintenance activities.
Savoy Hotel
Changes to Health & Safety requirements mean that works needed to be undertaken at the Savoy Hotel to protect maintenance staff
Royal College of Music
Bringing an older building up to code regarding health and safety is always a challenge.
Stornoway Slipway
Step on Safety supplied over 165 square metres of the anti-slip 4mm floor panels, pre-cut and pre-drilled to enable port staff to simply bolt...